
Tile cut so the joints carry through
The white button is a three-way sprinkler on the old hose line. Notching an L around it would leave a visible patch where every eye goes.
One renovation, start to finish
A thirty-year-old pool taken back to its shell. Every surface replaced, the structure kept. This goes behind the finished photographs.

Licensed, insured and family-owned













Design and planning
With the old surfaces off and the structure exposed, the work moved to planning — which is where a renovation is decided, not at the tile shop.
Most renovations are like this one: the shell has aged well and the finishes have not. The brief was to bring a dated pool up to date without changing its shape.
Materials were chosen for how they hold up in hard water and full sun, not only for how they photograph dry. The coping profile has its own page: Pool Coping.
We love details
The work is judged on the set-out, the substrate and the joints.
Swimming pool renovation timelapse
Once you have watched it, the write-up above covers the same project in detail.
The crew
Four of us. The same faces every week, not whoever was free that morning.




Collected from customers on the routes we run every week.
Tell us what the pool needs, how big it is and your ZIP — and a price the same day.
Rewards
$100 for every friend you send us, up to two. No code, no form — they call and mention your name.
Where we work
What a pool area can become when the shell is sound and only the surfaces have aged.
Office · Studio City
If you are on this page, you have most likely had a quote from us with a link to it. Ask about anything in it.
4121 Radford Ave, Ste. #214, Studio City, CA 91604Written for Foothill and Valley homeowners.

How long each finish lasts, what it asks of your care, and what the gap costs.

The decisions that are expensive to change afterwards.

Water has no colour of its own — the interior gives it one.
From the truck
Nothing staged, nothing bought from a stock library — the same work, filmed while it happened.
Three to five weeks on a normal job, and the calendar is set by curing rather than by labour. Demolition and chip-out is two or three days, repairs and preparation a week, tile and coping a week, the interior finish one day — and then twenty-eight days of start-up chemistry while the plaster cures under water. Rain adds days, because nothing goes on a wet shell.
Down to the shell first, then outward. Old interior off, cracks and rust cut back to sound concrete, plumbing and fittings replaced while the walls are open, tile and coping set, and the interior finish last because everything above it drops debris. Doing it in any other order means grinding new plaster to fit old tile. The twenty-eight days afterwards are their own job — see plaster start-up.
It follows what comes off and what goes back on: the size of the interior, whether tile and coping are in scope, and what the chip-out reveals underneath. We quote in writing after seeing the pool. Where a Los Angeles job starts, and what pushes it either way, is set out on the resurfacing cost page.
No, and not for a month after it refills either — the first twenty-eight days are brushing and testing on a surface that is still hardening. Plan a renovation for the months you are not swimming. Booked in autumn it is finished before anyone wants the water; booked in June it takes the summer.
Cleaning, recovery, repair and renovation across Los Angeles.
Be a part of our journey
This is what the work looks like from the inside, on the stages that decide how it lasts.