
Stripping the old surface
Paint, pebble, plaster or old tile off the shell, and the waste hauled away. Renovation always costs more than a new build.
Renovation
The tile is only the last quarter-inch. The shell under it, the repairs, the render and the set-out decide whether a tiled pool still looks right in year fifteen. Tile itself almost never fails.

Licensed, insured and family-owned












After
BeforeWhy a tiled interior outlasts everything else
Ceramic and porcelain are the most demanding pool finishes to install, because the preparation has to be right before any of it goes down and there is no correcting it afterwards.
True luxury is not simply choosing an expensive tile. What makes a pool read as expensive is the tile lines, the proportions and the finishing details agreeing with each other.


Before you compare two quotes
Someone can be a good general tiler and a poor pool tiler. The difference is whether they can diagnose, repair, render and prepare a shell before covering it — or only lay tile on whatever they are given. See our Los Angeles pool tiling service.
Tile does not go over paint, and it should not go over old tile: in both cases you would be bonding a permanent finish to something whose condition nobody can confirm. It will look right for two seasons. Fiberglass and vinyl-lined pools we do not tile at all — a flexible shell moves and tile does not.
Check the licence before you sign anything. For pool work you want C-53, current, in the same name as the quote, with a bond — ours is R R Pools, licence #970493, classifications C-53 and C-61/D-35, and it is public on cslb.ca.gov. Then ask for photographs of the substrate stage, not the before and after.
After
BeforeTilers for new pool builds
If you are building a new pool, or have just had one sprayed, you are going to need a pool tiler. Hire one who can render as well as tile: those two being separate trades is where most new-build tiling problems start.
Many tilers cannot render a pool and need you to hire a renderer separately. That means two trades, two quotes, and each one able to blame the other when something goes hollow.
We are a licensed California pool contractor — R R Pools, licence #970493, classifications C-53 and C-61/D-35. Rates and quotes are further down this page; shells from scratch are on New Pool Construction.
The crew
Four of us. The same faces every week, not whoever was free that morning.




This week on the job
Short clips from real visits. Nothing staged, nothing bought from a stock library.
A low rate per square foot is not a low total
Most advertised prices cover laying and grouting. Everything below is priced separately — if it is priced at all.
How we deliver the luxury feel
The tile colour, the water colour, the coping and the surroundings should feel like they arrived together.
What pool tile costs in Los Angeles
Most advertised tiling prices cover laying and grouting, nothing else. On a renovation the preparation is usually the larger half.
What a pool tiling quote should include
A quote that says only “tile pool” leaves everything open — and who wrote it matters as much as what it says.
Silver Lake

Tiling projects, start to finish
Collected from customers on the routes we run every week.
Tell us what the pool needs, how big it is and your ZIP — and a price the same day.
Rewards
$100 for every friend you send us, up to two. No code, no form — they call and mention your name.
Where we work
We prepare, render and fully tile concrete pools across the Valley and the Foothills.
Office · Studio City
Send your cross streets and photos of the interior, and we will say what has to come off first.
4121 Radford Ave, Ste. #214, Studio City, CA 91604Written for Foothill and Valley homeowners.

What changes when the equipment and the finish are not ordinary.

The decisions that are expensive to change afterwards.

Water has no colour of its own — the interior gives it one.
A new concrete shell can be rendered, prepared and fully tiled once the concrete has had its curing time. Painted, plastered, pebble and previously tiled concrete pools can all be converted, once the old surface is off and the shell underneath has been sounded out and repaired. Fiberglass and vinyl-lined pools cannot: a flexible shell moves and tile does not.
Tile is sold by the square foot. Entry-level ceramic mosaic starts around $60 per square foot and glass mosaic around $97, with premium colours and formats well past that. Those are supply figures only — preparation and installation are separate, and on a renovation they are usually the larger half.
Pool size and the contractor's minimum charge, removing the old surface and hauling it away, crack, rust and leak repairs, rendering and levelling, waterproofing, the tile itself, curves and custom cuts, steps, benches, ledges, spas and spillways, detailing around every fitting, and access. Spas are priced separately because corners and seats take far more time per square foot than an open floor.
A finished tiled pool looks simple because the preparation is hidden. The price covers demolition, fault finding, concrete and render preparation, detailed set-out, thousands of cuts, immersion-rated materials, work around fittings, controlled curing, and responsibility for a finish expected to stay underwater for decades. You are not only paying for the tiles you can see.
A properly prepared and tiled concrete pool gives a smooth, easy-to-clean and highly durable interior. Tile resists staining and pool chemicals well, can often be repaired in sections, and needs no repainting or resurfacing. The upfront cost is higher, so it is generally chosen by owners who want long service life and low surface maintenance.
It focuses on fully tiled pools, experienced crews, elevated detail and a more considered process from the first visit to handover. It is for projects where preparation and detail take precedence over the lowest number.
For people who want the top of the range and understand that the result depends on the installer and the preparation, not on the tile in the box.
Pool Care LA is a trade name of R R Pools, California contractor licence #970493, classifications B (General Building) and C-53 (Swimming Pool). It is public on cslb.ca.gov and takes two minutes to check.
Tile outlasts every other pool interior by a wide margin. It is gentler on skin than most rendered finishes, and it is also the most expensive thing you can put in a pool. A fully tiled pool is the easiest interior to look after, because there is nothing porous for algae to hold onto.
Yes and no. The up-front cost is the highest of any interior. The running cost is the lowest, and it is the only interior that is not on a replacement cycle — which is the entire argument. Every other interior needs more chemical to hold the same reading, and eventually replacement; plaster in Los Angeles water reaches the short end of its published life, not the long end.
Yes, if you would rather not source it yourself. We can also point owner-builders at formwork, steel fixing, shotcrete and pool plumbing crews we have worked with.
Cleaning, recovery, repair and renovation across Los Angeles.
Family owned, based in Studio City
Do not compare tiling quotes by the final number alone. Compare the preparation included and the products named.